Track plans

Track plans

The Port

Inside the port operations area there is an electrified loop track together with a number of loading, unloading and hardstanding tracks. The loop track has an obstacle free length of 375 m and other tracks are approx. 250 m. Track plan showing rail facilities inside the operations area for Port of Piteå.

Track plan showing rail facilities inside the operations area for Port of Piteå.

Trackplan, port

 

Energy railway yard

After the railwayyard at the port of Piteå comes the Energy railway yard. This yard is meant to to support the petroleum- and liquefied petroleum gas loading onto the railway.

Track plan energibangården

 

Backen

By the Backen industrial track there is a non-electrified industrial track consisting of a main track and four shorter tracks for loading, unloading or hardstanding, connected to various areas of operation such as goods trading, scrapping and chemical management.

Track plan, Backen